Reepham to Norwich roadworks in July

Works are programmed to begin on or soon after Monday 8th July to repair and strengthen sections of the C261 Reepham Road (heading from Reepham to Norwich).  The works will extend from 30m west of the staggered junction with Taverham Road and Fir Covert Road in Taverham to 30m south of the junction with Furze Lane in Booton. The works are expected to last for a period of two weeks and will be followed by the application of surface dressing. The diversion route will take people along the B1145 Dereham Road to Bawdeswell and then to Norwich along the A1067 Fakenham Road.