Traffic restrictions and roadworks starting within the next week for the Reepham district have been issued by roadworks.org
B1149 Holt Road, Heydon
12–14 December
Delays likely: Traffic control (stop/go boards)
Works location: At end of layby
Works description: Carriageway patching
Responsibility for works: Norfolk
Current status: Planned work about to start
Works reference: HU608103275LTPA
Chapel Street, Cawston
11–13 December
Delays likely: Road closure
Works location: Near no. 29
Works description: New connection
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD03010493332
Norwich Road, Cawston
12–14 December
Delays possible: Some carriageway incursion
Works location: At the junction of Back Lane on Norwich Road
Works description: REEPHAM R7 - DSLAM 580239 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in verge/cw to facilitate spine cabling works.
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006MU1WSEP00IBWAH7DS06
Woodforde Close, Weston Longville
12–14 December
Delays possible: Traffic control (give & take)
Works location: Outside no. 9-10
Works description: Disconnect and remove kiosk
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005PP25W00001603880100
Bexfield Drive, Foulsham
11–13 December
Delays unlikely: Some carriageway incursion
Works location: no. 15
Works description: Meter exchange proactive dig
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD03054723007
Brandiston Road, Cawston
12–14 December
Delays unlikely: Some carriageway incursion
Works location: from the junction of Back Lane to opp. 9 on Brandiston Road
Works description: REEPHAM R7 - DSLAM 580239 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in verge/cw to facilitate spine cabling works.
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006MU1WSEP00IBWAH7DS05
Chapel Street, Cawston
11–13 December
Delays unlikely: Some carriageway incursion
Works location: Works being done under Anglian Water colab - their ref: AD03010493332 - Adj to 16 Chapel Street. f\w. c\w.
Works description: Connections small service: Installation of a new electricity supply for a customer: Works being done under Anglian Water colab - their ref: AD03010493332 - Adj to 16 Chapel Street. Permit raised for cable lay and reinstatement purposes
Responsibility for works: UK Power Networks Eastern & London
Current status: Planned work about to start
Works reference: EC30034802630
Church Lane, Cawston
19–20 December
Delays unlikely: Some carriageway incursion
Works location: at junction with High Street
Works description: two dropped kerb crossing points for footpath end of Church Lane
Responsibility for works: Norfolk
Current status: Planned work about to start
Works reference: HU10300015552