Local traffic restrictions and roadworks from 9 February

Traffic restrictions and roadworks starting within the next week for the Reepham district have been issued by one.network on 9 February.
 
Buxton Road, Cawston
9 February
Delays likely - Traffic control (Stop/Go boards)
Works location: Botany Bay Farm
Works description: Other obstruction tree work
Responsibility for works: Norfolk County Council
Works reference: ARN-2600-02451112
 
Cherry Tree Lane, Lyng
12 February
Delays likely - Road closure
Works location: Cherry Tree Lane 280m from JNT Cherry Tree Lane and Primrose Green
Works description: Traffic management required for safe area for pole testing
Responsibility for works: Openreach
Works reference: BC008PTMS235350A
 
Fakenham Road, Great Witchingham
15–17 February
Delays likely - Traffic control (two-way signals)
Works location: 35
Works description: Install/renew district meter
Responsibility for works: Anglian Water
Works reference: AD01458457476
 
Holt Road, Cawston
11–15 February
Delays likely - Traffic control (Stop/Go boards)
Works location: Norwich-bound lane please, patch out to centre line defective section 20x3m
Works description: Carriageway patching
Responsibility for works: Norfolk County Council
Works reference: HU608178841LTPA
 
The Street, Lyng
10 February
Delays likely - Traffic control (two-way signals)
Works location: Opposite Manor Farm
Works description: REEPHAM - 742984 - excavate to replace 1 existing BT pole in verge
Responsibility for works: Openreach
Works reference: BC411NLWBHTMK4T001
 
Saint Faiths Close, Great Witchingham
10–12 February
Delays unlikely - Some carriageway incursion
Works location: Right of 3A
Works description: Lower cover and frame on wash out
Responsibility for works: Anglian Water
Works reference: AD03158374948